Slash IT and Desktop Support Costs

Slash Windows 7 Migration Resource Requirements

In an October 2010 Windows 7 migration study by Symantec, respondents said the most time-consuming aspects of the process were:

  • Planning (17%)
  • Actual execution of the upgrade (12%)
  • Reinstalling applications (10%)
  • Inventorying existing machines (10%)
  • Running pilot tests (9%)

Wouldn’t it be unbelievable to make the middle three tasks disappear and significantly simplify the other two? Desktop Virtualization by Virtual Bridges makes it possible.  The secret: The desktop runs from a centralized server.

LinkedInShare